The Opera Prima complex is a 14-storey building made of monolithic reinforced concrete. A group of Italian architects MDM Collaborative developed it.

Total area: 24,000 m2
Years of work: 2011-2013

The Climate Engineering Company was involved in adapting the Italian engineering system project to Ukrainian building codes and rules, as well as for finalizing and detailing the project. In this case, we applied 3D modeling to reflect the progress of all engineering networks in real terms. It helped to come to an agreement with other subcontractors about the passing levels of all networks, “insert” them into the architecture of the building, as well as to implement a design project.