Project description

This is the first stadium in Ukraine, prepared for the Euro-2012. Number of seats

in this stadium is 31 000. Climate Engineering Company has become a winner

of the international tender held by the general contractor, the German construction

company Hochtief.

Climate Engineering Company has done the design of project documentation for all

engineering systems, as well as the supply of equipment and installation of these

systems, including gas boiler, heating system for football field, heating, ventilation

and air conditioning VIP-area of 10000m2, water supply and sewage systems,

a transformer substation and a diesel generator set, a lighting system for the football

field and other engineering systems.