A complex, being on boulevard of Shevchenko in Kyiv, includes underground parking, hotel "Hilton" (1-8 floors) and rooms of lux class (10-24 floors).

Climate Engineering Company, LTD executed development of the stage «Project» and designed working drawings of the systems of heating, ventilation, air conditioning and antismoky defence, automation and control of the engineerings systems centralized traffic.


© 2013 Climate Engineering. Все права защищены.